Design-Build Project Delivery in Military Construction: Approach to Best Value Procurement

Authors

  • Birtice Garner Georgia Institute of Technology, United States
  • Kathleen Richardson Georgia Institute of Technology, United States
  • Daniel Castro-Lacouture Georgia Institute of Technology, United States

DOI:

https://doi.org/10.37265/japiv.v1i1.121

Keywords:

Design-build, MILCON Transformation, Project Delivery, Best Value

Abstract

Design-Build is rapidly becoming one of the most commonly used project delivery methods in the facility construction industry. The United States Air Force and the Air Force Reserve Command (AFRC) are expected to establish a target of 75% of all Military Construction (MILCON) projects delivered using the Design-Build method. The use of this delivery method will bring significant changes in the relationships between the various parties associated with facility project delivery when compared to the traditional Design-Bid-Build method. This paper demonstrates that Design-Build delivery with a best value selection is an important tool in accomplishing AFRC’s cost efficient, rapid response transformation goals applicable to facility construction. Three hundred thirty two projects in program years 2002 through 2006, constructed using both traditional Design-Bid-Build or Design-Build delivery methods, were examined. Parameters used for comparisons were construction cost and schedule growth, project cost, vertical versus horizontal construction, and number of days required to prepare solicitation documents, advertise and accomplish construction award. This research reveals significant project schedule advantages with Design-Build best value selection delivery. The advantages are apparent in both pre and post construction award activities. Potential Design-Build cost advantages are hindered by Defense Federal Acquisition Regulations requiring firm fixed price contracts at construction award.

Downloads

Published

2008-06-02

How to Cite

Garner, B., Richardson, K., & Castro-Lacouture, D. (2008). Design-Build Project Delivery in Military Construction: Approach to Best Value Procurement. Journal for the Advancement of Performance Information and Value, 1(1), 35. https://doi.org/10.37265/japiv.v1i1.121