[1]
Gajjar, D., Sullivan, K. and Kashiwagi, D. 2013. Post Construction Quality Evaluation – A Manufacturer’s Use of the End User to Minimize Risk. Journal for the Advancement of Performance Information and Value. 5, 1 (Jun. 2013), 20. DOI:https://doi.org/10.37265/japiv.v5i1.83.