Gajjar, D., Sullivan, K., & Kashiwagi, D. (2013). Post Construction Quality Evaluation – A Manufacturer’s Use of the End User to Minimize Risk. Journal for the Advancement of Performance Information and Value, 5(1), 20. https://doi.org/10.37265/japiv.v5i1.83