A Structured Approach for Questionnaire Survey of Construction Delay

Authors

  • Yue Chong KOG, President, PhD East West Engineering Consultants

DOI:

https://doi.org/10.37265/japiv.v11i1.5

Keywords:

Egypt, schedule, performance, construction delay factors, structured approach, questionnaire survey

Abstract

Construction delay is a common problem costing the industry billions of dollars every year. The first step to reduce this unnecessary loss is to identify the major delay factors. More than 200 studies on major construction delays have been reported using self-administered questionnaire surveys of views of project participants. The present approach adopted is reviewed by a case study of Egypt. Thirty-two delay factors were identified as major construction delay factors. A thorough review of these eight studies revealed many shortcomings in the present approach. A structured approach is proposed for questionnaire survey to study major construction delay factors.

Downloads

Published

2019-08-03

How to Cite

KOG, Y. C. (2019). A Structured Approach for Questionnaire Survey of Construction Delay. Journal for the Advancement of Performance Information and Value, 11(1), 21–33. https://doi.org/10.37265/japiv.v11i1.5