A Structured Approach for Questionnaire Survey of Construction Delay
DOI:
https://doi.org/10.37265/japiv.v11i1.5Keywords:
Egypt, schedule, performance, construction delay factors, structured approach, questionnaire surveyAbstract
Construction delay is a common problem costing the industry billions of dollars every year. The first step to reduce this unnecessary loss is to identify the major delay factors. More than 200 studies on major construction delays have been reported using self-administered questionnaire surveys of views of project participants. The present approach adopted is reviewed by a case study of Egypt. Thirty-two delay factors were identified as major construction delay factors. A thorough review of these eight studies revealed many shortcomings in the present approach. A structured approach is proposed for questionnaire survey to study major construction delay factors.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2019 Yue Chong KOG, President, PhD
This work is licensed under a Creative Commons Attribution 4.0 International License.