Best Value Procurement Results within the GSA

Authors

  • John Savicky, M.S. Arizona State University, United States
  • Dean Kashiwagi, PhD, PE Arizona State University, United States
  • Kristen C. Barlish, M.S. Arizona State University, United States
  • Kenneth Sullivan, PhD Arizona State University, United States

DOI:

https://doi.org/10.37265/japiv.v6i1.72

Keywords:

PIPS, GSA, Best Value, Case Study, Performance Results

Abstract

A large government agency, seeking to become more efficient, implemented the Performance Information Procurement System (PIPS) Best Value (BV) process on various construction projects to determine if the program could increase the performance of outsourced services. The impact of this model for increasing the performance of procured projects is presented. The environment of the projects and testing of the process were unique, as they allowed concurrent testing and validation of multiple projects, similar in scope, and uniform application of key performance metrics. A case study is also used to illustrate the overall performance of the BV process. The findings in this paper show that the process resulted in approximately a 60% increase in performance with regards to customer satisfaction, project delays, and cost increases. In an industry with delays in excess of 20-50%, a model that results in an increase of performance for outsourced services is significant.

Downloads

Published

2014-12-01

How to Cite

Savicky, J., Kashiwagi, D., Barlish, K., & Sullivan, K. (2014). Best Value Procurement Results within the GSA. Journal for the Advancement of Performance Information and Value, 6(1), 72. https://doi.org/10.37265/japiv.v6i1.72